Purified666
Member
- Joined
- Sep 21, 2017
- Messages
- 315
I'm talking about serious workings 108+ vibrations.
I'll be doing 6 workings and 3 planetary squares, so I can't afford to let an hour pass inbetween them...
Is 30 minutes enough? And should I leave the most important working for last, so it's energies have all the time they need to settle?
I'll be doing 6 workings and 3 planetary squares, so I can't afford to let an hour pass inbetween them...
Is 30 minutes enough? And should I leave the most important working for last, so it's energies have all the time they need to settle?